
Need: 3 story, 4 unit condo completed within one year from order and on budget.
Solution: Using the architects design and the engineering requirements, Conquest will build 6 modules for assembly on-site. The 4,280 s.f. structure is constructed using a combination of steel and wood structure to maximize the strength and flexibility offered by the respective materials. The condo project’s special feature is the Energuide rating associated with it, and the use of energy conserving fixtures, and environmentally products used.
Customer: Karoleena Custom Homes
Construction time: 45 days
Date of installation: January, 2009
Location: Calgary, Alberta

Carpenters, plumbers and electricians will spend the next six weeks hooking everything up to make it ready for move in.
The four-plex will use geothermal heat and is equipped with a smart system which allows the homeowners to adjust lighting and heating from the Internet.
None of the units have been sold yet. Each is expected to fetch about $550,000.