Need: The client, a freight company, required a new office for their expansion in the Edmonton region. Significant office space was required to accommodate staff as well as a lounge area for drivers.
Solution: Conquest designed and built a 40’ x 76’ office building using two modules. The module exteriors consisted of metal siding with a metal roof, and the interiors incorporated pre-finished, fire-guard drywall.
Construction time: 25 days
Date of installation: February, 2008
Location:
Edmonton, AB