
Need: Canada Post required a post office for a remote community in Alberta. The module needed to be built to Canada Post specifications and incorporate pre-existing Canada Post materials and fittings.
Solution: Conquest built a 20’ x 76’ (1,520 square foot) module to the client’s specifications. The exterior finish included steel siding and a steel roof. Interior finishes included painted drywall and heat seam flooring (with rubber cove base). Special features included the installation of post office boxes (as provided by Canada Post), a door chime, client-supplied merchandise displays, and signage. Steel mesh reinforced walls were used for security purposes.
Construction time: 42 days
Date of installation: November, 2006
Location: Morley, Alberta